Triple

T6188895
Position Surface form Disambiguated ID Type / Status
Subject Diridon Station E138135 entity
Predicate railLine P848 FINISHED
Object Coast Line E262611 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Coast Line | Statement: [Diridon Station, railLine, Coast Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Coast Line
Context triple: [Diridon Station, railLine, Coast Line]
  • A. Coast Line chosen
    Coast Line was a major Southern Pacific Railroad route running along California’s Pacific coast, connecting key cities such as Los Angeles and San Francisco.
  • B. North Coast Line
    The North Coast Line is a major railway corridor in New South Wales, Australia, running along the state’s north coast and connecting Sydney with Brisbane and numerous regional centres.
  • C. Coastal Line
    Coastal Line is a major Sri Lankan railway route running along the island’s western and southern coasts, linking Colombo with key coastal towns and cities.
  • D. Marshlink Line
    The Marshlink Line is a regional railway route in Southeast England that runs across the Romney Marsh, connecting Ashford International with Hastings and serving several rural communities.
  • E. East Coast Line
    The East Coast Line is a major Swedish railway route running along the country’s eastern seaboard, connecting key cities and regions including Gävleborg County.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a8fd408190b7ec6e42934974a6 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c062192c5481909eb41f8c5d1208a3 completed March 22, 2026, 9:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69c16f06c770819087e055cfe6c8b134 completed March 23, 2026, 4:49 p.m.
Created at: March 22, 2026, 4:19 p.m.