Triple

T6163956
Position Surface form Disambiguated ID Type / Status
Subject Dhaka Metro Rail E137510 entity
Predicate firstLine P829 FINISHED
Object MRT Line 6
MRT Line 6 is the inaugural mass rapid transit corridor of Dhaka, Bangladesh, forming the backbone of the city’s emerging metro rail network.
E573588 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MRT Line 6 | Statement: [Dhaka Metro Rail, firstLine, MRT Line 6]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: MRT Line 6
Context triple: [Dhaka Metro Rail, firstLine, MRT Line 6]
  • A. Metro Line 6
    Metro Line 6 is a line of the Mexico City Metro system that serves the northern part of the city, including the Gustavo A. Madero borough.
  • B. MRT Line 3
    MRT Line 3 is a major elevated rapid transit line in Metro Manila that runs along EDSA, serving as one of the region’s primary commuter rail corridors.
  • C. MRT Orange Line
    The MRT Orange Line is a rapid transit route in Bangkok’s Mass Rapid Transit system designed to connect key eastern and western parts of the city.
  • D. MRT Purple Line
    The MRT Purple Line is a mass rapid transit route in Bangkok, Thailand, serving as one of the city's key urban rail corridors.
  • E. MRT Pink Line
    The MRT Pink Line is a mass rapid transit route in Bangkok’s elevated monorail network, serving suburban areas in the city’s northern and eastern corridors.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: MRT Line 6
Triple: [Dhaka Metro Rail, firstLine, MRT Line 6]
Generated description
MRT Line 6 is the inaugural mass rapid transit corridor of Dhaka, Bangladesh, forming the backbone of the city’s emerging metro rail network.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: MRT Line 6
Target entity description: MRT Line 6 is the inaugural mass rapid transit corridor of Dhaka, Bangladesh, forming the backbone of the city’s emerging metro rail network.
  • A. Metro Line 6
    Metro Line 6 is a line of the Mexico City Metro system that serves the northern part of the city, including the Gustavo A. Madero borough.
  • B. MRT Line 3
    MRT Line 3 is a major elevated rapid transit line in Metro Manila that runs along EDSA, serving as one of the region’s primary commuter rail corridors.
  • C. MRT Orange Line
    The MRT Orange Line is a rapid transit route in Bangkok’s Mass Rapid Transit system designed to connect key eastern and western parts of the city.
  • D. MRT Purple Line
    The MRT Purple Line is a mass rapid transit route in Bangkok, Thailand, serving as one of the city's key urban rail corridors.
  • E. MRT Pink Line
    The MRT Pink Line is a mass rapid transit route in Bangkok’s elevated monorail network, serving suburban areas in the city’s northern and eastern corridors.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a54fc88190b6ce4416490ca79d completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c05d6036f88190a4bf540e7fe8d48d completed March 22, 2026, 9:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69c1419e7f0481908b7ce6f36871f1ad completed March 23, 2026, 1:35 p.m.
NEDg Description generation batch_69c14855288881909b842db040fe5c54 completed March 23, 2026, 2:04 p.m.
NED2 Entity disambiguation (via description) batch_69c148d16c048190a473e8f49df43705 completed March 23, 2026, 2:06 p.m.
Created at: March 22, 2026, 4:17 p.m.