Triple

T6147793
Position Surface form Disambiguated ID Type / Status
Subject Kim Il-sung Square E137122 entity
Predicate locatedOnWatercourse P1489 FINISHED
Object Taedong River E156027 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Taedong River | Statement: [Kim Il-sung Square, locatedOnWatercourse, Taedong River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Taedong River
Context triple: [Kim Il-sung Square, locatedOnWatercourse, Taedong River]
  • A. Taedong River chosen
    The Taedong River is a major river in North Korea that flows through the capital city of Pyongyang and serves as an important geographical and cultural landmark.
  • B. Nakdong River
    The Nakdong River is South Korea's longest river, flowing through the southeastern region and playing a crucial role in the country's history, ecology, and economy.
  • C. Baram River
    The Baram River is one of the largest rivers in northern Borneo, flowing through the Malaysian state of Sarawak to the South China Sea and supporting diverse indigenous communities and rainforest ecosystems.
  • D. Neryungri River
    Neryungri River is a river in the Sakha Republic (Yakutia), Russia, that gives its name to the nearby mining town of Neryungri.
  • E. Yeong River
    The Yeong River is a river in South Korea that feeds into the larger Nakdong River system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a2c6308190a56519b22d55d083 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c05ce07fb081909278088e9e2e2959 completed March 22, 2026, 9:19 p.m.
NED1 Entity disambiguation (via context triple) batch_69c16ed4abc88190993cfd4ef4f2862e completed March 23, 2026, 4:48 p.m.
Created at: March 22, 2026, 4:16 p.m.