Triple

T6146552
Position Surface form Disambiguated ID Type / Status
Subject H8 beam line E137092 entity
Predicate instanceOf P0 FINISHED
Object particle physics beam line C6336 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: particle physics beam line
Context triple: [H8 beam line, instanceOf, particle physics beam line]
  • A. particle beam line chosen
    A particle beam line is an engineered pathway of magnets, vacuum tubes, and diagnostic devices that transports, focuses, and shapes a stream of charged particles from a source to experimental or application targets.
  • B. particle accelerator
    A particle accelerator is a machine that uses electromagnetic fields to propel charged particles to high speeds and direct them into beams for research, medical, or industrial applications.
  • C. linear particle accelerator
    A linear particle accelerator is a device that uses oscillating electric fields along a straight path to accelerate charged particles to high speeds for research, medical, or industrial applications.
  • D. particle accelerator complex
    A particle accelerator complex is an integrated facility comprising accelerators, beamlines, detectors, and support infrastructure designed to accelerate charged particles to high energies for research, medical, or industrial applications.
  • E. particle accelerator upgrade project
    A particle accelerator upgrade project is a coordinated engineering and scientific effort to enhance an existing accelerator’s performance, capabilities, or reliability through targeted hardware, software, and infrastructure improvements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008a2c6308190a56519b22d55d083 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:16 p.m.