Triple
T6130469
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | A57 road |
E136703
|
entity |
| Predicate | roadNumber |
P1864
|
FINISHED |
| Object | A57 |
E433904
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A57 | Statement: [A57 road, roadNumber, A57]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: A57 Context triple: [A57 road, roadNumber, A57]
-
A.
A57
chosen
The A57 is a major road in the United Kingdom that connects several towns and cities across northern England, providing an important east–west transport route.
-
B.
A55
A55 is a major Australian highway route designation used for sections of the Castlereagh Highway in New South Wales.
-
C.
A56
The A56 is a major road in North West England that runs between Chester and Broughton, passing through key urban areas including Manchester.
-
D.
A595
The A595 is a primary road in Cumbria, England, running along the county’s western side and serving as a key route to coastal towns and the western Lake District.
-
E.
A59
A59 is a major road in northern England that runs between Liverpool and York, passing through key towns such as Preston and Skipton.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008a0a37c81908e5b4f879158afb3 |
completed | March 22, 2026, 3:20 p.m. |
| NER | Named-entity recognition | batch_69c05c4de9c48190b98f67a6251ec1df |
completed | March 22, 2026, 9:17 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c135d080808190938e3a1095080850 |
completed | March 23, 2026, 12:45 p.m. |
Created at: March 22, 2026, 4:15 p.m.