Triple

T6082579
Position Surface form Disambiguated ID Type / Status
Subject British Rail Class 390 E135558 entity
Predicate family P566 FINISHED
Object Alstom Pendolino E135558 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Alstom Pendolino | Statement: [British Rail Class 390, family, Alstom Pendolino]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Alstom Pendolino
Context triple: [British Rail Class 390, family, Alstom Pendolino]
  • A. Sm6 Pendolino
    The Sm6 Pendolino is a high-speed tilting electric multiple unit train used on cross-border services between Finland and Russia.
  • B. Class 390 Pendolino chosen
    The Class 390 Pendolino is a high-speed tilting electric multiple unit train used by Avanti West Coast on the West Coast Main Line in the United Kingdom.
  • C. British Rail Class 220
    The British Rail Class 220 is a high-speed diesel-electric multiple unit train used in the UK for intercity services, known as part of the Voyager family built by Bombardier.
  • D. British Rail Class 155
    The British Rail Class 155 is a type of diesel multiple unit passenger train built in the late 1980s for regional services on the UK rail network.
  • E. British Rail Class 325
    The British Rail Class 325 is an electric multiple unit train type designed specifically for high-speed postal and parcel services on the UK rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0087ad31c8190ab936e0ff28614b6 completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c05786233c81909010a6c2f7e7dfda completed March 22, 2026, 8:56 p.m.
NED1 Entity disambiguation (via context triple) batch_69c11d57b5f481908d7df374837a486a completed March 23, 2026, 11 a.m.
Created at: March 22, 2026, 4:11 p.m.