Triple
T6062612
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Witham Navigable Drains |
E135070
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | drainage channel network |
C6053
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: drainage channel network Context triple: [Witham Navigable Drains, instanceOf, drainage channel network]
-
A.
drainage channel
A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
-
B.
waterway network
chosen
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
C.
drainage basin
A drainage basin is a land area where all precipitation collects and drains off into a common outlet, such as a river, lake, or ocean.
-
D.
hydrological system
A hydrological system is the interconnected network of water storage and movement through the atmosphere, land, and water bodies, driven by processes such as precipitation, evaporation, infiltration, and runoff.
-
E.
river basin
A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c00878d06881909ee78e88913bf890 |
completed | March 22, 2026, 3:19 p.m. |
Created at: March 22, 2026, 4:10 p.m.