Triple
T6061312
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gangneung Coastal Cluster |
E135036
|
entity |
| Predicate | planningPhase |
P22825
|
FINISHED |
| Object | bidding and preparation for 2018 Winter Olympics |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: bidding and preparation for 2018 Winter Olympics | Statement: [Gangneung Coastal Cluster, planningPhase, bidding and preparation for 2018 Winter Olympics]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: planningPhase Context triple: [Gangneung Coastal Cluster, planningPhase, bidding and preparation for 2018 Winter Olympics]
-
A.
planning
Indicates that an entity is engaged in organizing or devising a future action, event, or course of behavior involving another entity or entities.
-
B.
planningStarted
Indicates that the process of planning for a particular task, project, or event has been initiated.
-
C.
programPhase
chosen
Indicates the specific stage or phase within a broader program or process that an entity is currently associated with.
-
D.
constructionPhase
Indicates the specific stage or period an entity is in within an overall construction or building process.
-
E.
planned
Indicates that an entity has intentionally arranged or scheduled another entity or event to occur in the future.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c00878d06881909ee78e88913bf890 |
completed | March 22, 2026, 3:19 p.m. |
| NER | Named-entity recognition | batch_69c0571fcecc8190a68e0d0668bbbfa7 |
completed | March 22, 2026, 8:54 p.m. |
| PD | Predicate disambiguation | batch_69c049f031408190b08b2766237c5dd0 |
completed | March 22, 2026, 7:58 p.m. |
Created at: March 22, 2026, 4:10 p.m.