Triple
T6060315
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Border Campaign of 1950 |
E135017
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Viet Minh offensive |
C886
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Viet Minh offensive Context triple: [Border Campaign of 1950, instanceOf, Viet Minh offensive]
-
A.
Javanese military campaign
A Javanese military campaign is a coordinated series of armed operations conducted by Javanese polities or forces to achieve specific political, territorial, or strategic objectives.
-
B.
Chinese Civil War campaign
A Chinese Civil War campaign is a coordinated series of military operations conducted by opposing Chinese factions, primarily the Nationalists and Communists, to achieve strategic control over specific regions or objectives during the broader conflict.
-
C.
guerrilla conflict
Guerrilla conflict is a form of irregular warfare in which small, mobile groups use hit-and-run tactics, ambushes, and sabotage to challenge a larger, conventionally organized force, often relying on local support and intimate knowledge of the terrain.
-
D.
event in the Vietnam War
chosen
An event in the Vietnam War is a specific, temporally bounded occurrence—such as a battle, operation, political decision, or diplomatic action—that significantly influenced the course, conduct, or consequences of the conflict.
-
E.
phase of the Chinese Civil War
A phase of the Chinese Civil War is a distinct, time-bounded period characterized by specific patterns of military conflict, political strategies, territorial control, and key events between the major opposing forces.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c00878d06881909ee78e88913bf890 |
completed | March 22, 2026, 3:19 p.m. |
Created at: March 22, 2026, 4:10 p.m.