Triple

T6057058
Position Surface form Disambiguated ID Type / Status
Subject Piazza del Campidoglio E134939 entity
Predicate instanceOf P0 FINISHED
Object Renaissance square C19841 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Renaissance square
Context triple: [Piazza del Campidoglio, instanceOf, Renaissance square]
  • A. Renaissance palace
    A Renaissance palace is a grand urban residence characterized by symmetrical facades, classical orders, and richly decorated interiors that reflect the humanist ideals and artistic innovations of the Renaissance period.
  • B. Renaissance building
    A Renaissance building is a structure characterized by symmetry, proportion, and classical elements such as columns, pilasters, arches, and domes, reflecting the revival of ancient Greek and Roman architectural principles during the 14th–17th centuries.
  • C. former public square
    A former public square is an open urban space that once served as a central gathering or civic area but has since been repurposed, redeveloped, or lost its original public function.
  • D. civic palace
    A civic palace is a grand, often monumental public building that houses key municipal or governmental functions and serves as a symbolic center of civic authority and community life.
  • E. Inca quarter
    An Inca quarter is an administrative and territorial division of the Inca Empire, representing one of the four major regions (suyus) that radiated from the capital, Cusco.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00877b6d4819096b0e163728b73a3 completed March 22, 2026, 3:19 p.m.
Created at: March 22, 2026, 4:09 p.m.