Triple

T6053289
Position Surface form Disambiguated ID Type / Status
Subject Centre technique de Bussy-Saint-Georges E134845 entity
Predicate instanceOf P0 FINISHED
Object technical center C7750 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: technical center
Context triple: [Centre technique de Bussy-Saint-Georges, instanceOf, technical center]
  • A. technical commission
    A technical commission is a specialized group of experts formally appointed to study, evaluate, and provide recommendations on complex technical or scientific matters within a specific domain.
  • B. shared service centre
    A shared service centre is a centralized organizational unit that consolidates and delivers common support functions (such as finance, HR, or IT) to multiple business units to improve efficiency, standardization, and cost-effectiveness.
  • C. testing facility chosen
    A testing facility is a specialized environment equipped with tools, equipment, and procedures designed to systematically evaluate, measure, and validate the performance, safety, or quality of products, systems, or processes.
  • D. design center
    A design center is a dedicated space or facility where customers and professionals can explore, plan, and coordinate design elements such as materials, finishes, and layouts for projects like homes, interiors, or products.
  • E. data center
    A data center is a specialized facility that houses networked computer systems, storage, and infrastructure to process, manage, and store large volumes of digital data.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00877b6d4819096b0e163728b73a3 completed March 22, 2026, 3:19 p.m.
Created at: March 22, 2026, 4:09 p.m.