Triple

T6049450
Position Surface form Disambiguated ID Type / Status
Subject Humboldt Bay Power Plant E134751 entity
Predicate decommissioningActivity P67965 FINISHED
Object reactor dismantlement LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: reactor dismantlement | Statement: [Humboldt Bay Power Plant, decommissioningActivity, reactor dismantlement]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: decommissioningActivity
Context triple: [Humboldt Bay Power Plant, decommissioningActivity, reactor dismantlement]
  • A. decommissioningStatus
    Indicates the current phase or condition of an entity in the process of being taken out of active service or use.
  • B. decommissionedReason
    Indicates the reason or cause for which an entity, typically an asset or system, was taken out of service or formally retired.
  • C. decommissioningEndDate
    Indicates the date on which a decommissioning process or status for something is completed or officially ends.
  • D. decommissionedWith
    Indicates that an entity was taken out of service or retired in conjunction with, or as part of the same process as, another specified entity.
  • E. decommissioningStartDate
    Indicates the date on which the process of taking an asset or system out of active service is initiated.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00876a69881908088a2626d3b2666 completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c056f4f84c8190a7e2416d81b3554c completed March 22, 2026, 8:54 p.m.
PD Predicate disambiguation batch_69c049edc6f0819092ca620d9073ad26 completed March 22, 2026, 7:58 p.m.
PDg Predicate description generation batch_69c04dbefd1081909795fe1a812b991a completed March 22, 2026, 8:14 p.m.
Created at: March 22, 2026, 4:09 p.m.