Triple

T6047387
Position Surface form Disambiguated ID Type / Status
Subject Genoa–Ventimiglia railway E134700 entity
Predicate importance P428 FINISHED
Object major coastal rail corridor in northwestern Italy LITERAL FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: major coastal rail corridor in northwestern Italy | Statement: [Genoa–Ventimiglia railway, importance, major coastal rail corridor in northwestern Italy]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00876a69881908088a2626d3b2666 completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c056e70fd48190b4554e9a516a1c88 completed March 22, 2026, 8:53 p.m.
Created at: March 22, 2026, 4:09 p.m.