Triple

T6038061
Position Surface form Disambiguated ID Type / Status
Subject Paranaíba River E134470 entity
Predicate hasReservoir P1025 FINISHED
Object São Simão Reservoir E563692 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: São Simão Reservoir | Statement: [Paranaíba River, hasReservoir, São Simão Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: São Simão Reservoir
Context triple: [Paranaíba River, hasReservoir, São Simão Reservoir]
  • A. São Simão Dam chosen
    São Simão Dam is a large hydroelectric power facility in Brazil known for generating electricity and forming the São Simão Reservoir on the Paranaíba River.
  • B. Cabril Reservoir
    Cabril Reservoir is a major artificial lake in central Portugal, created by a dam on the Zêzere River and used for hydroelectric power generation, water storage, and recreation.
  • C. Sobradinho
    Sobradinho is an administrative region of Brazil's Federal District, located near Brasília and known for its residential areas and proximity to the national capital.
  • D. Santo Antônio Dam
    Santo Antônio Dam is a large hydroelectric power plant in Brazil, built on the Madeira River near Porto Velho to generate electricity as part of the Madeira River energy complex.
  • E. Itumbiara Reservoir
    Itumbiara Reservoir is a large artificial lake in Brazil created for hydroelectric power generation and water regulation on the Paranaíba River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00875db5c819099dd5bb833ec43c2 completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c056ccac948190a27547878d4db8e4 completed March 22, 2026, 8:53 p.m.
NED1 Entity disambiguation (via context triple) batch_69c1251a3bec81909a654976712f147d completed March 23, 2026, 11:33 a.m.
Created at: March 22, 2026, 4:08 p.m.