Triple

T6033977
Position Surface form Disambiguated ID Type / Status
Subject T2 beam line E134372 entity
Predicate instanceOf P0 FINISHED
Object accelerator beam line C6336 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: accelerator beam line
Context triple: [T2 beam line, instanceOf, accelerator beam line]
  • A. particle beam line chosen
    A particle beam line is an engineered pathway of magnets, vacuum tubes, and diagnostic devices that transports, focuses, and shapes a stream of charged particles from a source to experimental or application targets.
  • B. linear particle accelerator
    A linear particle accelerator is a device that uses oscillating electric fields along a straight path to accelerate charged particles to high speeds for research, medical, or industrial applications.
  • C. particle accelerator
    A particle accelerator is a machine that uses electromagnetic fields to propel charged particles to high speeds and direct them into beams for research, medical, or industrial applications.
  • D. radio-frequency linear accelerator
    A radio-frequency linear accelerator is a device that uses oscillating electromagnetic fields in a series of resonant cavities to accelerate charged particles along a straight path to high energies.
  • E. particle accelerator complex
    A particle accelerator complex is an integrated facility comprising accelerators, beamlines, detectors, and support infrastructure designed to accelerate charged particles to high energies for research, medical, or industrial applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0087515148190a97475d412563865 completed March 22, 2026, 3:19 p.m.
Created at: March 22, 2026, 4:08 p.m.