Triple

T6024771
Position Surface form Disambiguated ID Type / Status
Subject Sun Link modern streetcar E134148 entity
Predicate instanceOf P0 FINISHED
Object light rail transit C912 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: light rail transit
Context triple: [Sun Link modern streetcar, instanceOf, light rail transit]
  • A. light rail transit line
    A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
  • B. light rail vehicle
    A light rail vehicle is a rail-based transit vehicle designed for urban and suburban passenger service, typically operating on dedicated or shared tracks with frequent stops and moderate capacity.
  • C. rail transit chosen
    Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
  • D. light rail expansion project
    A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
  • E. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008742a5c8190b9cb9c2787a3d8b3 completed March 22, 2026, 3:19 p.m.
Created at: March 22, 2026, 4:07 p.m.