Triple
T6018088
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | San Francisco 3rd and Townsend Street station |
E133995
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former Caltrain station |
C2424
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former Caltrain station Context triple: [San Francisco 3rd and Townsend Street station, instanceOf, former Caltrain station]
-
A.
former railway station
chosen
A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
-
B.
former name of railway station
A former name of a railway station is a historical designation previously used to identify a specific station before it was officially renamed or rebranded.
-
C.
commuter rail station
A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
-
D.
MBTA Commuter Rail station
An MBTA Commuter Rail station is a designated passenger facility along the Massachusetts Bay Transportation Authority’s regional rail network where trains stop to allow riders to board, alight, and connect with other modes of transit.
-
E.
AeroTrain station
An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008742a5c8190b9cb9c2787a3d8b3 |
completed | March 22, 2026, 3:19 p.m. |
Created at: March 22, 2026, 4:07 p.m.