Triple
T6011164
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Third Taiwan Strait Crisis |
E133833
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cross-strait crisis |
C3144
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cross-strait crisis Context triple: [Third Taiwan Strait Crisis, instanceOf, cross-strait crisis]
-
A.
anti-Chinese incident
An anti-Chinese incident is an event or action, ranging from verbal harassment to physical violence or discriminatory policies, specifically targeting individuals, communities, or institutions perceived as Chinese.
-
B.
crisis
chosen
A crisis is a critical turning point or period of intense difficulty and instability that demands urgent decision-making and action to prevent severe negative consequences.
-
C.
border conflict
A border conflict is a dispute between neighboring states or groups over the ownership, control, or demarcation of a shared territorial boundary.
-
D.
nuclear weapons crisis
A nuclear weapons crisis is a high-stakes international confrontation in which the use or threatened use of nuclear arms becomes a realistic possibility, creating urgent risks of catastrophic escalation and intense diplomatic, military, and political pressure to resolve the conflict.
-
E.
diplomatic incident
A diplomatic incident is an event or action involving representatives of different states that causes tension, conflict, or embarrassment in their official relations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0087361a48190905c6b55969852b8 |
completed | March 22, 2026, 3:19 p.m. |
Created at: March 22, 2026, 4:06 p.m.