Triple

T5992419
Position Surface form Disambiguated ID Type / Status
Subject Happy Loman E133381 entity
Predicate workBehavior P67882 FINISHED
Object exaggerates professional success LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: exaggerates professional success | Statement: [Happy Loman, workBehavior, exaggerates professional success]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: workBehavior
Context triple: [Happy Loman, workBehavior, exaggerates professional success]
  • A. workMode
    Indicates the manner, configuration, or operational state in which an entity performs its work or function.
  • B. worksOver
    Indicates that one entity performs work that extends beyond or exceeds a certain limit, threshold, or standard associated with another entity.
  • C. workPattern
    Indicates the typical schedule, structure, or arrangement according to which an entity performs its work or duties.
  • D. workBecame
    Indicates that one work was transformed, adapted, or evolved into another work over time.
  • E. workSetting
    Indicates the environment, context, or conditions in which the work or activity is carried out.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00870ddbc81909880fa3864f4f38d completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c04e8fd030819095a4f3b3d425ec21 completed March 22, 2026, 8:18 p.m.
PD Predicate disambiguation batch_69c049e152e88190979ab80cb9b50321 completed March 22, 2026, 7:58 p.m.
PDg Predicate description generation batch_69c04dbefd1081909795fe1a812b991a completed March 22, 2026, 8:14 p.m.
Created at: March 22, 2026, 4:05 p.m.