Triple

T5963033
Position Surface form Disambiguated ID Type / Status
Subject Holtet depot E132684 entity
Predicate instanceOf P0 FINISHED
Object public transport facility C7253 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public transport facility
Context triple: [Holtet depot, instanceOf, public transport facility]
  • A. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • B. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • C. public transit station chosen
    A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
  • D. park-and-ride facility
    A park-and-ride facility is a designated parking area where commuters leave their vehicles and transfer to public transportation for the remainder of their journey.
  • E. public transportation agency
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0086c2364819091e9fe2f58fa2517 completed March 22, 2026, 3:19 p.m.
Created at: March 22, 2026, 4:03 p.m.