Triple

T5958096
Position Surface form Disambiguated ID Type / Status
Subject Zêzere River E132565 entity
Predicate hasHydroelectricDam P15311 FINISHED
Object Bouçã Dam E562003 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bouçã Dam | Statement: [Zêzere River, hasHydroelectricDam, Bouçã Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bouçã Dam
Context triple: [Zêzere River, hasHydroelectricDam, Bouçã Dam]
  • A. Alicurá Dam
    Alicurá Dam is a large hydroelectric dam in Argentina’s Patagonia region, known for forming the Alicurá Reservoir and generating power on the Limay River.
  • B. Barra Bonita Dam
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • C. Bouçã Reservoir chosen
    Bouçã Reservoir is a man-made lake in central Portugal created by a hydroelectric dam on the Zêzere River.
  • D. Almourol Dam
    Almourol Dam is a hydroelectric dam on Portugal’s Tagus River, known for its role in regional power generation and water management.
  • E. Valdecañas Dam
    Valdecañas Dam is a large hydroelectric and water-regulation dam on the Tagus River in Spain, known for forming the Valdecañas Reservoir used for power generation, irrigation, and recreation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0086b05cc8190a8f36a96927a525c completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c039c48d0c81908e794c52fddf2ca2 completed March 22, 2026, 6:49 p.m.
NED1 Entity disambiguation (via context triple) batch_69c5e3a5d54c8190b2bc8b3291f8ac2f completed March 27, 2026, 1:55 a.m.
Created at: March 22, 2026, 4:02 p.m.