Triple

T5954122
Position Surface form Disambiguated ID Type / Status
Subject Lake Volta E132468 entity
Predicate hasDam P8736 FINISHED
Object Kpong Dam E352672 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kpong Dam | Statement: [Lake Volta, hasDam, Kpong Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kpong Dam
Context triple: [Lake Volta, hasDam, Kpong Dam]
  • A. Kpong Dam chosen
    Kpong Dam is a hydroelectric power facility on Ghana’s Volta River that generates electricity and supports irrigation and water supply in the region.
  • B. Thein Dam
    Thein Dam, also known as Ranjit Sagar Dam, is a major multipurpose hydroelectric and irrigation dam located on the Ravi River in northern India.
  • C. Pong Dam
    Pong Dam is a large embankment dam in Himachal Pradesh, India, primarily built for irrigation, flood control, and hydroelectric power generation on the Beas River.
  • D. Pandoh Dam
    Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
  • E. Nam Ngum 2 Dam
    Nam Ngum 2 Dam is a major hydroelectric power dam in Laos that generates electricity by harnessing the flow of the Nam Ngum River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0086b05cc8190a8f36a96927a525c completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c039bef5c8819093f280b235a593b0 completed March 22, 2026, 6:49 p.m.
NED1 Entity disambiguation (via context triple) batch_69c0e3d77fb08190a24d319adc608df5 completed March 23, 2026, 6:55 a.m.
Created at: March 22, 2026, 4:02 p.m.