Triple
T5954122
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lake Volta |
E132468
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object | Kpong Dam |
E352672
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kpong Dam | Statement: [Lake Volta, hasDam, Kpong Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Kpong Dam Context triple: [Lake Volta, hasDam, Kpong Dam]
-
A.
Kpong Dam
chosen
Kpong Dam is a hydroelectric power facility on Ghana’s Volta River that generates electricity and supports irrigation and water supply in the region.
-
B.
Thein Dam
Thein Dam, also known as Ranjit Sagar Dam, is a major multipurpose hydroelectric and irrigation dam located on the Ravi River in northern India.
-
C.
Pong Dam
Pong Dam is a large embankment dam in Himachal Pradesh, India, primarily built for irrigation, flood control, and hydroelectric power generation on the Beas River.
-
D.
Pandoh Dam
Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
-
E.
Nam Ngum 2 Dam
Nam Ngum 2 Dam is a major hydroelectric power dam in Laos that generates electricity by harnessing the flow of the Nam Ngum River.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0086b05cc8190a8f36a96927a525c |
completed | March 22, 2026, 3:19 p.m. |
| NER | Named-entity recognition | batch_69c039bef5c8819093f280b235a593b0 |
completed | March 22, 2026, 6:49 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c0e3d77fb08190a24d319adc608df5 |
completed | March 23, 2026, 6:55 a.m. |
Created at: March 22, 2026, 4:02 p.m.