Triple

T5933322
Position Surface form Disambiguated ID Type / Status
Subject TotalEnergies E131987 entity
Predicate instanceOf P0 FINISHED
Object renewable energy company C8157 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: renewable energy company
Context triple: [TotalEnergies, instanceOf, renewable energy company]
  • A. energy solutions company
    An energy solutions company designs, develops, and delivers technologies and services that provide efficient, reliable, and sustainable energy to residential, commercial, and industrial customers.
  • B. renewable energy developer
    A renewable energy developer is an entity or professional that identifies, plans, finances, and constructs projects that generate power from sustainable sources such as solar, wind, hydro, or geothermal energy.
  • C. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • D. wholesale energy company
    A wholesale energy company is a business that buys large quantities of electricity or fuel from producers and sells them in bulk to utilities, large industrial customers, or other resellers, often managing supply, pricing, and risk in energy markets.
  • E. integrated energy company chosen
    An integrated energy company is a business that operates across multiple stages of the energy value chain—such as exploration, production, refining, distribution, and retail—often spanning both fossil fuels and renewable energy sources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0085c55dc8190aa90e242c956e2fa completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 4 p.m.