Triple

T5925043
Position Surface form Disambiguated ID Type / Status
Subject Christopher Weaver E131787 entity
Predicate instanceOf P0 FINISHED
Object video game industry pioneer C12892 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: video game industry pioneer
Context triple: [Christopher Weaver, instanceOf, video game industry pioneer]
  • A. Nintendo executive
    A Nintendo executive is a high-level decision-maker responsible for guiding the company’s strategic direction, overseeing game and hardware portfolios, and managing business operations to sustain Nintendo’s brand and market success.
  • B. information technology pioneer
    An information technology pioneer is an individual who significantly advances the development, application, or understanding of computing and digital technologies, often introducing groundbreaking concepts, systems, or practices that shape the evolution of the IT field.
  • C. electronics pioneer
    An electronics pioneer is an individual who significantly advances the development, understanding, or application of electronic technologies through original inventions, theories, or systems.
  • D. game producer chosen
    A game producer oversees the planning, coordination, and delivery of a video game project, managing budgets, schedules, teams, and communication between stakeholders to ensure the game is completed successfully.
  • E. television pioneer
    A television pioneer is an individual who significantly contributed to the early development, innovation, or popularization of television technology, programming, or broadcasting.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0085b75e88190a632f9691f9da48b completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 4 p.m.