Triple

T5923743
Position Surface form Disambiguated ID Type / Status
Subject pub package manager E131755 entity
Predicate instanceOf P0 FINISHED
Object Dart tooling component C15486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Dart tooling component
Context triple: [pub package manager, instanceOf, Dart tooling component]
  • A. developer tool chosen
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • B. collection of programming tools
    A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
  • C. integrated development environment component
    An integrated development environment component is a modular tool or feature within an IDE that provides specific functionality—such as code editing, debugging, or project management—to support and streamline software development.
  • D. front-end build tool
    A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
  • E. data engineering tool
    A data engineering tool is a software solution that enables the collection, transformation, orchestration, and management of data pipelines to ensure reliable, scalable, and efficient data processing.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0085a1ed08190a7e9a8b6323fd680 completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 4 p.m.