Triple

T5913902
Position Surface form Disambiguated ID Type / Status
Subject Bombardier Innovia APM 200 E131530 entity
Predicate family P566 FINISHED
Object Innovia APM E131530 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Innovia APM | Statement: [Bombardier Innovia APM 200, family, Innovia APM]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Innovia APM
Context triple: [Bombardier Innovia APM 200, family, Innovia APM]
  • A. Bombardier Innovia APM 200 chosen
    The Bombardier Innovia APM 200 is a fully automated, rubber-tired people mover system commonly used for airport and urban transit connections.
  • B. Innoventions
    Innoventions was an interactive exhibit pavilion at Epcot in Walt Disney World that showcased emerging technologies and hands-on science displays.
  • C. Siemens Inspiro
    Siemens Inspiro is a modern, modular metro train platform developed by Siemens for urban rapid transit systems worldwide.
  • D. Avisio
    Avisio is a river in northern Italy that flows through the Trentino region before joining the Adige.
  • E. Efficeon
    Efficeon is a family of low-power, x86-compatible microprocessors developed by Transmeta as the successor to its Crusoe line, aimed primarily at mobile and embedded computing devices.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008593a44819081a07ae0efe6c574 completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c037b9f0908190ad854e5f2600f114 completed March 22, 2026, 6:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69c0c01ddd30819088571c5b56dbae83 completed March 23, 2026, 4:22 a.m.
Created at: March 22, 2026, 3:59 p.m.