Triple

T5913854
Position Surface form Disambiguated ID Type / Status
Subject Rental car center at Phoenix Sky Harbor International Airport E131529 entity
Predicate instanceOf P0 FINISHED
Object ground transportation facility C19543 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ground transportation facility
Context triple: [Rental car center at Phoenix Sky Harbor International Airport, instanceOf, ground transportation facility]
  • A. transport hub
    A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
  • B. rapid transit depot
    A rapid transit depot is a specialized facility where urban rail vehicles are stored, inspected, maintained, and dispatched for service on a rapid transit network.
  • C. rapid transit station
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • D. combined civic building and transportation hub
    A combined civic building and transportation hub is a multifunctional public facility that integrates government or community services with major transit infrastructure to centralize access, improve connectivity, and enhance urban efficiency.
  • E. public transit station
    A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008593a44819081a07ae0efe6c574 completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:59 p.m.