Triple

T5893601
Position Surface form Disambiguated ID Type / Status
Subject Western Indonesia E131049 entity
Predicate timeZoneAbbreviation P714 FINISHED
Object WIB E23518 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: WIB | Statement: [Western Indonesia, timeZoneAbbreviation, WIB]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: WIB
Context triple: [Western Indonesia, timeZoneAbbreviation, WIB]
  • A. Western Indonesian Time chosen
    Western Indonesian Time is the standard time zone used in western parts of Indonesia, including major regions such as Java and Sumatra, set at UTC+7.
  • B. Central Indonesia Time
    Central Indonesia Time is one of Indonesia’s standard time zones, set at UTC+8 and used by regions including Sulawesi, Bali, and parts of Kalimantan and Nusa Tenggara.
  • C. Indonesia Standard Time system
    The Indonesia Standard Time system is the national timekeeping framework that divides Indonesia into multiple official time zones, including Western Indonesian Time.
  • D. Indochina Time
    Indochina Time is the standard time zone (UTC+7) used in several Southeast Asian countries, including Thailand, Vietnam, Cambodia, and Laos.
  • E. Weton
    Weton is a traditional Javanese astrological and calendrical system that combines five-day and seven-day cycles to determine auspicious days and personal characteristics.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00857439c819095950754176aa58a completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c036f220dc8190ad553d33de4e2ecd completed March 22, 2026, 6:37 p.m.
NED1 Entity disambiguation (via context triple) batch_69c0b15146888190ab86eaf9e565ee28 completed March 23, 2026, 3:19 a.m.
Created at: March 22, 2026, 3:58 p.m.