Triple

T5886448
Position Surface form Disambiguated ID Type / Status
Subject Woolwich Arsenal Gatehouse E130874 entity
Predicate hasNeighbouringSite P5707 FINISHED
Object Royal Arsenal Riverside redevelopment E126978 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Royal Arsenal Riverside redevelopment | Statement: [Woolwich Arsenal Gatehouse, hasNeighbouringSite, Royal Arsenal Riverside redevelopment]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Royal Arsenal Riverside redevelopment
Context triple: [Woolwich Arsenal Gatehouse, hasNeighbouringSite, Royal Arsenal Riverside redevelopment]
  • A. Royal Arsenal Riverside regeneration project chosen
    The Royal Arsenal Riverside regeneration project is a major mixed-use redevelopment transforming the historic Royal Arsenal site in Woolwich into a modern residential, commercial, and cultural riverside district.
  • B. Thames Gateway regeneration area
    The Thames Gateway regeneration area is a major urban renewal and development corridor in South East England focused on revitalizing former industrial and brownfield sites along the River Thames.
  • C. Liverpool Waters regeneration scheme
    The Liverpool Waters regeneration scheme is a major long-term waterfront redevelopment project in Liverpool, England, transforming former docklands into a mixed-use district of residential, commercial, and leisure spaces.
  • D. Hull Maritime City project
    The Hull Maritime City project is a major heritage-led regeneration initiative in Kingston upon Hull that revitalizes the city’s maritime assets, museums, and waterfront to celebrate its seafaring history and boost tourism.
  • E. Bramley-Moore Dock stadium development
    Bramley-Moore Dock stadium development is Everton F.C.’s new purpose-built waterfront football stadium project on Liverpool’s historic northern docks, intended to replace Goodison Park as the club’s home ground.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasNeighbouringSite
Context triple: [Woolwich Arsenal Gatehouse, hasNeighbouringSite, Royal Arsenal Riverside redevelopment]
  • A. isAdjacentTo chosen
    Indicates that one entity is directly next to or bordering another without anything of the same type in between.
  • B. hasAdjacentSettlement
    Indicates that one settlement is located directly next to or bordering another settlement.
  • C. hasNeighborhoodAlong
    Indicates that one entity has a neighboring area or region that extends along the boundary or length of another entity.
  • D. hasNeighbouringWard
    Indicates that one ward is directly adjacent to or borders another ward geographically.
  • E. containsSite
    Indicates that one entity spatially or structurally includes another entity as a site or location within its bounds.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0085628dc8190b334c1b44c067efc completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c03fe07b7081909f8577ec3a9a1a8d completed March 22, 2026, 7:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69c0b13ce8788190b07771180f0fa376 completed March 23, 2026, 3:19 a.m.
PD Predicate disambiguation batch_69c0334bdc308190ad0d7199ab975588 completed March 22, 2026, 6:22 p.m.
Created at: March 22, 2026, 3:57 p.m.