Triple

T5868031
Position Surface form Disambiguated ID Type / Status
Subject General Enrollment Period E130444 entity
Predicate hasEndMonth P34851 FINISHED
Object March LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: March | Statement: [General Enrollment Period, hasEndMonth, March]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasEndMonth
Context triple: [General Enrollment Period, hasEndMonth, March]
  • A. hasMonth
    Indicates that something is associated with, occurs in, or is assigned to a specific month.
  • B. isFinalMonthOf chosen
    Indicates that one time period is the last month within the duration or lifecycle of another specified period or process.
  • C. hasMonthCount
    Indicates a relationship where an entity is associated with a specific number of months.
  • D. hasSchoolYearEndMonth
    Indicates the month in which a school year ends for a given educational institution or system.
  • E. hasEnd
    Indicates that one entity serves as the terminal point, boundary, or conclusion of another entity or process.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0085047dc8190af24e311edad3c07 completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c044ffaef081909faaa7f420a3b9b7 completed March 22, 2026, 7:37 p.m.
PD Predicate disambiguation batch_69c03347e51c81909053bcf34e3b88ab completed March 22, 2026, 6:22 p.m.
Created at: March 22, 2026, 3:56 p.m.