Triple

T5858124
Position Surface form Disambiguated ID Type / Status
Subject South Hills E130205 entity
Predicate servedBy P82 FINISHED
Object Pittsburgh light rail system E245518 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pittsburgh light rail system | Statement: [South Hills, servedBy, Pittsburgh light rail system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pittsburgh light rail system
Context triple: [South Hills, servedBy, Pittsburgh light rail system]
  • A. Pittsburgh Regional Transit chosen
    Pittsburgh Regional Transit is the primary public transportation agency serving the Pittsburgh metropolitan area, operating buses, light rail, and other transit services across the region.
  • B. Huntington Area Rapid Transit
    Huntington Area Rapid Transit is the local bus system serving the town of Huntington in Suffolk County, New York.
  • C. Baltimore Light Rail
    Baltimore Light Rail is a regional light rail transit system serving Baltimore, Maryland, and its surrounding suburbs.
  • D. LYNX light rail system
    The LYNX light rail system is Charlotte, North Carolina’s urban rail transit network, providing electric passenger service along key corridors such as the Blue Line.
  • E. TRAX light rail
    TRAX light rail is a public transit light rail system in the Salt Lake City metropolitan area of Utah, operated by the Utah Transit Authority.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0084f3bb08190a7720f55f7aa4252 completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c0358654e48190908e7390a0164726 completed March 22, 2026, 6:31 p.m.
NED1 Entity disambiguation (via context triple) batch_69c0a1c3a69881908ffeee1ddbeb8618 completed March 23, 2026, 2:13 a.m.
Created at: March 22, 2026, 3:56 p.m.