Triple
T5844429
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bridgestone Arena |
E129672
|
entity |
| Predicate | operator |
P179
|
FINISHED |
| Object |
Powers Management
Powers Management is the company responsible for overseeing and running operations at Nashville’s Bridgestone Arena.
|
E549953
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Powers Management | Statement: [Bridgestone Arena, operator, Powers Management]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Powers Management Context triple: [Bridgestone Arena, operator, Powers Management]
-
A.
Powers
Powers is a variant form of the surname Power, commonly of Irish origin and borne by various notable individuals and families.
-
B.
Power and Controls
Power and Controls is a Collins Aerospace division specializing in aircraft power generation, distribution, and control systems for commercial and military aviation.
-
C.
POWER1
POWER1 is IBM’s first-generation 32-bit RISC microprocessor architecture used in early RS/6000 workstations and servers.
-
D.
Power & Energy
Power & Energy is a specialized division of WSP Global focused on providing engineering and consulting services for power generation, transmission, and energy infrastructure projects.
-
E.
Power Vista
Power Vista is an interactive visitor center and observation facility that showcases hydroelectric power generation and offers views of the Niagara River and Robert Moses Niagara Power Plant.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Powers Management Triple: [Bridgestone Arena, operator, Powers Management]
Generated description
Powers Management is the company responsible for overseeing and running operations at Nashville’s Bridgestone Arena.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Powers Management Target entity description: Powers Management is the company responsible for overseeing and running operations at Nashville’s Bridgestone Arena.
-
A.
Powers
Powers is a variant form of the surname Power, commonly of Irish origin and borne by various notable individuals and families.
-
B.
Power and Controls
Power and Controls is a Collins Aerospace division specializing in aircraft power generation, distribution, and control systems for commercial and military aviation.
-
C.
POWER1
POWER1 is IBM’s first-generation 32-bit RISC microprocessor architecture used in early RS/6000 workstations and servers.
-
D.
Power & Energy
Power & Energy is a specialized division of WSP Global focused on providing engineering and consulting services for power generation, transmission, and energy infrastructure projects.
-
E.
Power Vista
Power Vista is an interactive visitor center and observation facility that showcases hydroelectric power generation and offers views of the Niagara River and Robert Moses Niagara Power Plant.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0084bd31c8190a796bb6284845e83 |
completed | March 22, 2026, 3:18 p.m. |
| NER | Named-entity recognition | batch_69c034db104881908c230de0e869f64b |
completed | March 22, 2026, 6:28 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c0a1a6587c8190b76b1005178c29a9 |
completed | March 23, 2026, 2:12 a.m. |
| NEDg | Description generation | batch_69c0a2bd6cdc819096c6829dc8d5d61e |
completed | March 23, 2026, 2:17 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69c0a323d9248190aa803c27be3d5eec |
completed | March 23, 2026, 2:19 a.m. |
Created at: March 22, 2026, 3:55 p.m.