Triple

T5837445
Position Surface form Disambiguated ID Type / Status
Subject Norwegian petroleum licensing rounds E129506 entity
Predicate instanceOf P0 FINISHED
Object petroleum licensing system C6665 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: petroleum licensing system
Context triple: [Norwegian petroleum licensing rounds, instanceOf, petroleum licensing system]
  • A. oil field
    An oil field is a region of the Earth's surface and subsurface containing multiple oil reservoirs, wells, and associated infrastructure for extracting and processing crude petroleum.
  • B. crude oil pipeline system
    A crude oil pipeline system is an integrated network of pipes, pumps, valves, and control equipment designed to safely and efficiently transport unrefined petroleum from production sites to storage, processing, or export facilities.
  • C. oil-producing region
    An oil-producing region is a geographic area where significant quantities of crude oil are extracted, often characterized by specialized infrastructure, economic dependence on petroleum, and associated environmental and geopolitical impacts.
  • D. natural gas field
    A natural gas field is a subsurface accumulation of natural gas trapped in porous rock formations, typically exploited through drilling and production infrastructure for commercial energy use.
  • E. operating permit program chosen
    An operating permit program is a regulatory framework that requires facilities to obtain and comply with permits specifying conditions under which they may operate, typically to control environmental, safety, or public health impacts.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0084af79c81908af128ccc29983d0 completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:54 p.m.