Triple

T583610
Position Surface form Disambiguated ID Type / Status
Subject Marché du Film E15109 entity
Predicate instanceOf P0 FINISHED
Object industry event C1824 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: industry event
Context triple: [Marché du Film, instanceOf, industry event]
  • A. event chosen
    An event is a distinct occurrence or happening, often bounded in time and space, that involves one or more participants and may trigger changes in state or behavior within a system.
  • B. international exposition
    An international exposition is a large-scale, globally focused public event where nations and organizations showcase achievements in culture, technology, industry, and innovation through themed exhibits and activities.
  • C. community event
    A community event is a planned gathering or activity that brings members of a local group or neighborhood together for a shared purpose, such as celebration, education, support, or civic engagement.
  • D. conference center
    A conference center is a large, purpose-built facility designed to host meetings, conventions, exhibitions, and other events, providing flexible spaces and supporting services for groups of various sizes.
  • E. event series
    An event series is a recurring sequence of related events organized under a common theme, purpose, or brand, typically scheduled over a defined period.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4935783b8819082b77726ec10cc42 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:33 p.m.