Triple
T5821442
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Trans-Alaska Pipeline Authorization Act |
E129116
|
entity |
| Predicate | terminalPoint |
P390
|
FINISHED |
| Object | Valdez Marine Terminal |
E298412
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Valdez Marine Terminal | Statement: [Trans-Alaska Pipeline Authorization Act, terminalPoint, Valdez Marine Terminal]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Valdez Marine Terminal Context triple: [Trans-Alaska Pipeline Authorization Act, terminalPoint, Valdez Marine Terminal]
-
A.
Port of Valdez
chosen
The Port of Valdez is an ice-free deepwater port in Alaska that serves as the southern terminus of the Trans-Alaska Pipeline and a key hub for crude oil shipping.
-
B.
Fairfield Marine Terminal
Fairfield Marine Terminal is a major cargo-handling facility within the Port of Baltimore that supports the movement and storage of maritime freight.
-
C.
Masonville Marine Terminal
Masonville Marine Terminal is a cargo-handling facility within the Port of Baltimore that supports maritime shipping and related industrial operations.
-
D.
Seagirt Marine Terminal
Seagirt Marine Terminal is a major container and cargo handling facility in Baltimore, Maryland, serving as a key hub for international maritime trade on the U.S. East Coast.
-
E.
Dames Point Marine Terminal
Dames Point Marine Terminal is a major deepwater cargo facility in Jacksonville, Florida, serving as one of JAXPORT’s key hubs for container, bulk, and automobile shipping.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: terminalPoint Context triple: [Trans-Alaska Pipeline Authorization Act, terminalPoint, Valdez Marine Terminal]
-
A.
endPoint
chosen
Indicates the terminal location, limit, or final state reached by an object, process, or path in a given relationship or action.
-
B.
terminus
Indicates that one entity serves as the final endpoint or stopping place for another entity’s movement, route, or process.
-
C.
terminusSplitPoint
Indicates a point at which a route, path, or process reaches its end and divides into two or more separate continuations or branches.
-
D.
terminusJunction
Indicates a relationship where a route, line, or path ends at a junction point that serves as its terminal connection.
-
E.
terminalName
Indicates the name or label assigned to a specific terminal or endpoint within a system or network.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0084869e881908d7859492183ca7b |
completed | March 22, 2026, 3:18 p.m. |
| NER | Named-entity recognition | batch_69c0400f1af881908d376ea4793f6dea |
completed | March 22, 2026, 7:16 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c0b0e85cbc8190ad75d4a8246fbe43 |
completed | March 23, 2026, 3:18 a.m. |
| PD | Predicate disambiguation | batch_69c0333fdd7081908d829265caa2ac11 |
completed | March 22, 2026, 6:21 p.m. |
Created at: March 22, 2026, 3:53 p.m.