Triple

T5817681
Position Surface form Disambiguated ID Type / Status
Subject S-IC E129026 entity
Predicate usedOnMission P2367 FINISHED
Object Apollo 9 E252271 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Apollo 9 | Statement: [S-IC, usedOnMission, Apollo 9]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Apollo 9
Context triple: [S-IC, usedOnMission, Apollo 9]
  • A. Apollo 9 chosen
    Apollo 9 was a 1969 crewed Earth-orbital mission in NASA’s Apollo program that tested the Lunar Module and key systems needed for the subsequent Moon landings.
  • B. Apollo 10
    Apollo 10 was a 1969 NASA mission that served as a full dress rehearsal for the first Moon landing, testing all lunar operations except the actual touchdown.
  • C. Apollo 12
    Apollo 12 was NASA’s second crewed mission to land humans on the Moon, notable for its precise landing near the Surveyor 3 probe in November 1969.
  • D. Apollo 6
    Apollo 6 was the second and final uncrewed test flight of NASA’s Saturn V rocket, launched in 1968 to validate the vehicle for subsequent crewed Apollo missions.
  • E. Apollo 7
    Apollo 7 was NASA’s 1968 Earth-orbiting test mission that successfully proved the redesigned Apollo spacecraft’s systems and paved the way for subsequent lunar missions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0084869e881908d7859492183ca7b completed March 22, 2026, 3:18 p.m.
NER Named-entity recognition batch_69c033e36cbc81908f1ef1a1a310674c completed March 22, 2026, 6:24 p.m.
NED1 Entity disambiguation (via context triple) batch_69c0e35ad1a081908c908b6eef12d855 completed March 23, 2026, 6:53 a.m.
Created at: March 22, 2026, 3:53 p.m.