Triple
T5814333
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Union Valley Reservoir |
E128946
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Upper American River Project
The Upper American River Project is a major hydroelectric power system in California’s Sierra Nevada that includes multiple dams, reservoirs, and powerhouses operated by the Sacramento Municipal Utility District.
|
E549090
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Upper American River Project | Statement: [Union Valley Reservoir, partOf, Upper American River Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Upper American River Project Context triple: [Union Valley Reservoir, partOf, Upper American River Project]
-
A.
Colorado-Big Thompson Project
The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
-
B.
Columbia Basin Project
The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
-
C.
Truckee-Carson Project
The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
-
D.
Klamath Project
The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
-
E.
Feather River Project
The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Upper American River Project Triple: [Union Valley Reservoir, partOf, Upper American River Project]
Generated description
The Upper American River Project is a major hydroelectric power system in California’s Sierra Nevada that includes multiple dams, reservoirs, and powerhouses operated by the Sacramento Municipal Utility District.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Upper American River Project Target entity description: The Upper American River Project is a major hydroelectric power system in California’s Sierra Nevada that includes multiple dams, reservoirs, and powerhouses operated by the Sacramento Municipal Utility District.
-
A.
Colorado-Big Thompson Project
The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
-
B.
Columbia Basin Project
The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
-
C.
Truckee-Carson Project
The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
-
D.
Klamath Project
The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
-
E.
Feather River Project
The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0084788848190bcf71f6bc5d71597 |
completed | March 22, 2026, 3:18 p.m. |
| NER | Named-entity recognition | batch_69c03361c79081908baf872821e79983 |
completed | March 22, 2026, 6:22 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c0984c5f14819096dfabce4a83e332 |
completed | March 23, 2026, 1:33 a.m. |
| NEDg | Description generation | batch_69c098d889e08190adbd12504a7f3fa1 |
completed | March 23, 2026, 1:35 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69c09990da18819099fdc8f25f2ddef2 |
completed | March 23, 2026, 1:38 a.m. |
Created at: March 22, 2026, 3:53 p.m.