Triple

T5813984
Position Surface form Disambiguated ID Type / Status
Subject Brooklyn Rapid Transit Company E128938 entity
Predicate instanceOf P0 FINISHED
Object transit company C221 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transit company
Context triple: [Brooklyn Rapid Transit Company, instanceOf, transit company]
  • A. mass transit operator chosen
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • B. transportation network company
    A transportation network company is a business that uses digital platforms, typically mobile apps, to connect passengers with drivers who provide on-demand transportation services.
  • C. public transportation agency
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • D. transportation services company
    A transportation services company is an organization that plans, manages, and operates the movement of people or goods using various modes of transport, such as road, rail, air, or sea, often providing logistics, scheduling, and support services.
  • E. paratransit operator
    A paratransit operator is a transportation service provider that offers flexible, demand-responsive rides—often door-to-door—for individuals whose disabilities or mobility limitations prevent them from using standard public transit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0084788848190bcf71f6bc5d71597 completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:52 p.m.