Triple

T5803220
Position Surface form Disambiguated ID Type / Status
Subject béton brut E128677 entity
Predicate instanceOf P0 FINISHED
Object construction material finish C1617 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: construction material finish
Context triple: [béton brut, instanceOf, construction material finish]
  • A. construction material chosen
    A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
  • B. building material
    A building material is any substance or product used in construction to form, support, protect, or finish the structural and architectural elements of a built environment.
  • C. building stone
    A building stone is a naturally occurring or processed rock material selected and shaped for use in constructing and facing structures due to its strength, durability, and aesthetic qualities.
  • D. steel finishing facility
    A steel finishing facility is an industrial plant where semi-finished steel products undergo surface treatment, coating, cutting, and other final processing steps to meet specific quality, dimensional, and performance requirements.
  • E. construction technique
    A construction technique is a specific method or process used to assemble materials and components into a built structure safely, efficiently, and according to design requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00846a0d881909e46841f8e156b64 completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:52 p.m.