Triple

T5786634
Position Surface form Disambiguated ID Type / Status
Subject Santander Cycles E128283 entity
Predicate instanceOf P0 FINISHED
Object dock-based bike sharing scheme C18839 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: dock-based bike sharing scheme
Context triple: [Santander Cycles, instanceOf, dock-based bike sharing scheme]
  • A. ride system
    A ride system is an integrated mechanical and control framework that transports guests or vehicles along a defined path or experience, coordinating motion, safety, and thematic elements.
  • B. micromobility device
    A micromobility device is a small, lightweight, typically single-passenger vehicle—often electric-powered—designed for short-distance urban travel, such as e-scooters, e-bikes, and similar compact transport options.
  • C. park-and-ride facility
    A park-and-ride facility is a designated parking area where commuters leave their vehicles and transfer to public transportation for the remainder of their journey.
  • D. cycle network
    A cycle network is a graph structure in which nodes are connected in a closed loop so that each node is part of at least one simple cycle, enabling circular paths for flow, communication, or dependencies.
  • E. national cycling infrastructure
    National cycling infrastructure is the integrated network of bike paths, lanes, facilities, and supporting policies designed at a country-wide level to enable safe, efficient, and accessible cycling for transportation and recreation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0084450048190bc647b649a05136b completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:51 p.m.