Triple
T5786634
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Santander Cycles |
E128283
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | dock-based bike sharing scheme |
C18839
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: dock-based bike sharing scheme Context triple: [Santander Cycles, instanceOf, dock-based bike sharing scheme]
-
A.
ride system
A ride system is an integrated mechanical and control framework that transports guests or vehicles along a defined path or experience, coordinating motion, safety, and thematic elements.
-
B.
micromobility device
A micromobility device is a small, lightweight, typically single-passenger vehicle—often electric-powered—designed for short-distance urban travel, such as e-scooters, e-bikes, and similar compact transport options.
-
C.
park-and-ride facility
A park-and-ride facility is a designated parking area where commuters leave their vehicles and transfer to public transportation for the remainder of their journey.
-
D.
cycle network
A cycle network is a graph structure in which nodes are connected in a closed loop so that each node is part of at least one simple cycle, enabling circular paths for flow, communication, or dependencies.
-
E.
national cycling infrastructure
National cycling infrastructure is the integrated network of bike paths, lanes, facilities, and supporting policies designed at a country-wide level to enable safe, efficient, and accessible cycling for transportation and recreation.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0084450048190bc647b649a05136b |
completed | March 22, 2026, 3:18 p.m. |
Created at: March 22, 2026, 3:51 p.m.