Triple

T5782283
Position Surface form Disambiguated ID Type / Status
Subject Rocky Flats Plant E128187 entity
Predicate instanceOf P0 FINISHED
Object nuclear weapons production facility C18805 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear weapons production facility
Context triple: [Rocky Flats Plant, instanceOf, nuclear weapons production facility]
  • A. nuclear weapons assembly plant
    A nuclear weapons assembly plant is a highly secure industrial facility where nuclear and non-nuclear components are manufactured, integrated, and tested to produce complete nuclear weapons in compliance with strict safety, security, and regulatory standards.
  • B. weapons-grade plutonium production facility
    A weapons-grade plutonium production facility is an industrial complex designed to produce, extract, and process plutonium with isotopic compositions suitable for use in nuclear weapons.
  • C. uranium processing facility
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • D. isotope production facility
    An isotope production facility is a specialized installation that generates radioactive or stable isotopes—typically using reactors, cyclotrons, or accelerators—for use in medicine, industry, research, and energy applications.
  • E. uranium enrichment facility
    A uranium enrichment facility is an industrial complex that increases the concentration of the fissile isotope U-235 in uranium to produce fuel for nuclear reactors or material for nuclear weapons.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0084450048190bc647b649a05136b completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:50 p.m.