Triple

T5755851
Position Surface form Disambiguated ID Type / Status
Subject Rolls-Royce Kestrel (design experience) E126964 entity
Predicate instanceOf P0 FINISHED
Object engineering knowledge base C10018 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering knowledge base
Context triple: [Rolls-Royce Kestrel (design experience), instanceOf, engineering knowledge base]
  • A. engineering library
    An engineering library is a specialized collection of technical resources, including books, journals, standards, and digital tools, that support research, education, and practice in engineering disciplines.
  • B. engineering handbook
    An engineering handbook is a comprehensive reference guide that compiles essential principles, formulas, standards, and best practices across engineering disciplines for practical problem-solving and design.
  • C. knowledge hub chosen
    A knowledge hub is a centralized platform or environment where information, expertise, and resources are collected, organized, and shared to support learning, collaboration, and informed decision-making.
  • D. engineering journal
    An engineering journal is a periodical publication that presents peer-reviewed research, technical developments, and practical applications in various fields of engineering.
  • E. engineering institute
    An engineering institute is an educational and research organization dedicated to teaching, advancing, and applying engineering principles and technologies across various specialized fields.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00832aedc81909899801b141fa3b4 completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:49 p.m.