Triple
T5755393
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | G72 Quanzhou–Nanning Expressway |
E126953
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Chinese national expressway |
C3788
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Chinese national expressway Context triple: [G72 Quanzhou–Nanning Expressway, instanceOf, Chinese national expressway]
-
A.
north–south highway
A north–south highway is a major roadway that primarily runs in a longitudinal direction, connecting regions or cities along a north-to-south axis.
-
B.
highway system
A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
-
C.
road transportation corridor
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
-
D.
National Highway in India
A National Highway in India is a major public roadway designated and maintained by the central government to connect key cities, ports, and regions across the country for efficient long-distance transportation.
-
E.
motorway
chosen
A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c00832aedc81909899801b141fa3b4 |
completed | March 22, 2026, 3:18 p.m. |
Created at: March 22, 2026, 3:49 p.m.