Triple
T5708873
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Air Force One (VC-25 variant) |
E125854
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Boeing VC-25 |
C4911
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Boeing VC-25 Context triple: [Air Force One (VC-25 variant), instanceOf, Boeing VC-25]
-
A.
retired presidential aircraft
A retired presidential aircraft is a former government-operated airplane that once served as official air transport for a nation's head of state but has since been decommissioned from active presidential service.
-
B.
X-plane
An X-plane is an experimental aircraft designed to test and demonstrate new aviation technologies, configurations, or performance capabilities beyond those of conventional aircraft.
-
C.
United States presidential aircraft designation
A United States presidential aircraft designation is the specific call sign or model identifier assigned to an aircraft when it is used to transport the President of the United States, such as "Air Force One" for Air Force-operated planes.
-
D.
Boeing 747 variant
chosen
A Boeing 747 variant is a specific model or configuration of the Boeing 747 airliner, distinguished by differences in size, range, engines, avionics, or interior layout tailored to particular airline or mission requirements.
-
E.
Boeing 707 derivative
A Boeing 707 derivative is any aircraft model developed from the original Boeing 707 airframe, incorporating modifications such as structural changes, updated systems, or specialized configurations while retaining its core design lineage.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0082d6fe48190b777fb383769e5c8 |
completed | March 22, 2026, 3:18 p.m. |
Created at: March 22, 2026, 3:46 p.m.