Triple
T5678663
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Classless Inter-Domain Routing |
E125147
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | routing methodology |
C11219
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: routing methodology Context triple: [Classless Inter-Domain Routing, instanceOf, routing methodology]
-
A.
transport strategy
A transport strategy is a high-level plan that defines how people and goods will be moved efficiently, safely, sustainably, and cost-effectively within and between areas over a given time horizon.
-
B.
path vector protocol
chosen
A path vector protocol is a type of routing protocol that advertises network reachability information along with the full path (sequence of autonomous systems or routers) to each destination, enabling loop avoidance and policy-based routing decisions.
-
C.
transportation route
A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
-
D.
scrambling route
A scrambling route is a non-technical climbing path that involves using hands and feet on steep, rocky terrain, typically without the need for ropes or specialized climbing gear.
-
E.
public transit route
A public transit route is a predefined path with designated stops and schedules along which public transportation vehicles (such as buses, trams, or trains) operate to move passengers between locations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008295c808190acfe78915e7d656a |
completed | March 22, 2026, 3:18 p.m. |
Created at: March 22, 2026, 3:44 p.m.