Triple

T5678663
Position Surface form Disambiguated ID Type / Status
Subject Classless Inter-Domain Routing E125147 entity
Predicate instanceOf P0 FINISHED
Object routing methodology C11219 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: routing methodology
Context triple: [Classless Inter-Domain Routing, instanceOf, routing methodology]
  • A. transport strategy
    A transport strategy is a high-level plan that defines how people and goods will be moved efficiently, safely, sustainably, and cost-effectively within and between areas over a given time horizon.
  • B. path vector protocol chosen
    A path vector protocol is a type of routing protocol that advertises network reachability information along with the full path (sequence of autonomous systems or routers) to each destination, enabling loop avoidance and policy-based routing decisions.
  • C. transportation route
    A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
  • D. scrambling route
    A scrambling route is a non-technical climbing path that involves using hands and feet on steep, rocky terrain, typically without the need for ropes or specialized climbing gear.
  • E. public transit route
    A public transit route is a predefined path with designated stops and schedules along which public transportation vehicles (such as buses, trams, or trains) operate to move passengers between locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008295c808190acfe78915e7d656a completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:44 p.m.