Triple
T5675759
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fukuoka Dome (master plan involvement) |
E125081
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | architectural master plan |
C11786
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: architectural master plan Context triple: [Fukuoka Dome (master plan involvement), instanceOf, architectural master plan]
-
A.
architectural design
Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
-
B.
landmark planning blueprint
chosen
A landmark planning blueprint is a strategic, visual, and documented plan that outlines the design, placement, significance, and long-term development of key landmarks within a geographic or urban context.
-
C.
town plan
A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
-
D.
architectural work
An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
-
E.
architectural position
An architectural position is a conceptual stance or guiding perspective that defines how an architect understands, interprets, and responds to the built environment through design.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008295c808190acfe78915e7d656a |
completed | March 22, 2026, 3:18 p.m. |
Created at: March 22, 2026, 3:43 p.m.