Triple
T5656917
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | TeAwa The Fearless River |
E124641
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | whitewater attraction |
C8343
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: whitewater attraction Context triple: [TeAwa The Fearless River, instanceOf, whitewater attraction]
-
A.
water ride
chosen
A water ride is an amusement attraction that uses water-filled channels, flumes, or pools to move riders through themed environments, often featuring splashes, drops, and soaking elements for entertainment.
-
B.
adventure park
An adventure park is a recreational facility offering a variety of physically engaging and often adrenaline-inducing outdoor activities, such as zip lines, climbing courses, and obstacle challenges, designed for fun, fitness, and exploration.
-
C.
waterfall area
A waterfall area is a natural or landscaped region surrounding a waterfall, including the cascade itself, its plunge pool, and adjacent terrain where water flow, mist, and erosion shape the local environment and visitor experience.
-
D.
recreational water body
A recreational water body is a natural or artificial water feature, such as a lake, pond, pool, or shoreline area, specifically used for leisure activities like swimming, boating, fishing, or relaxation.
-
E.
amusement park attraction
An amusement park attraction is a designed entertainment feature or ride that provides guests with thrilling, enjoyable, or immersive experiences within a themed recreational setting.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0082774a481909d7e63fb2aad56ac |
completed | March 22, 2026, 3:17 p.m. |
Created at: March 22, 2026, 3:42 p.m.