Triple
T5655386
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Boston Marathon finish line marker |
E124605
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | street landmark |
C1088
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: street landmark Context triple: [Boston Marathon finish line marker, instanceOf, street landmark]
-
A.
urban landmark
An urban landmark is a prominent, easily recognizable feature within a city—such as a building, monument, or natural formation—that serves as a visual reference point and symbol of the area’s identity.
-
B.
sidewalk monument
A sidewalk monument is a small, often low-profile commemorative structure or marker embedded in or adjacent to a pedestrian walkway to honor a person, event, or place.
-
C.
street
chosen
A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
-
D.
symbolic monument feature
A symbolic monument feature is a designed physical element or structure that represents, commemorates, or communicates cultural, historical, or ideological meanings within a landscape or built environment.
-
E.
urban promenade
An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0082774a481909d7e63fb2aad56ac |
completed | March 22, 2026, 3:17 p.m. |
Created at: March 22, 2026, 3:42 p.m.