Triple

T5650385
Position Surface form Disambiguated ID Type / Status
Subject Madison Street E124491 entity
Predicate cityStreetNumberingSystem P49387 FINISHED
Object Chicago grid system E297406 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chicago grid system | Statement: [Madison Street, cityStreetNumberingSystem, Chicago grid system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Chicago grid system
Context triple: [Madison Street, cityStreetNumberingSystem, Chicago grid system]
  • A. Chicago street grid chosen
    The Chicago street grid is a highly regular, numbered system of streets and avenues oriented primarily along the cardinal directions, forming the backbone of the city’s urban layout and navigation.
  • B. Philadelphia street grid
    The Philadelphia street grid is the historic, rectilinear urban layout of Philadelphia, designed in the 17th century by William Penn and surveyor Thomas Holme, that organizes the city into orderly, numbered north–south and named east–west streets.
  • C. Manhattan street grid
    The Manhattan street grid is the iconic, rectilinear network of numbered streets and avenues that organizes most of the borough of Manhattan into uniform city blocks.
  • D. Los Angeles street grid
    The Los Angeles street grid is the extensive, often irregular network of streets and boulevards that structures the layout, traffic flow, and neighborhood organization of the city of Los Angeles.
  • E. Chicago park and boulevard system
    The Chicago park and boulevard system is an interconnected network of parks and landscaped boulevards designed to encircle and link neighborhoods throughout Chicago, forming one of the city’s most significant historic urban planning features.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: cityStreetNumberingSystem
Context triple: [Madison Street, cityStreetNumberingSystem, Chicago grid system]
  • A. hasStreetNumberingSystem chosen
    Indicates that a location or area uses an organized system for assigning numbers to buildings or addresses along its streets.
  • B. hasJunctionNumbering
    Indicates that a road or route is assigned a specific numbering system for its junctions or intersections.
  • C. isNumberedStreet
    Indicates that a street is designated primarily by a number (e.g., "1st Street," "42nd Avenue") rather than by a proper name.
  • D. boroughNumber
    Indicates the numerical identifier assigned to a specific borough within a larger administrative or municipal division.
  • E. roadSystem
    Indicates a relationship where multiple roads are organized and connected as part of a larger, integrated transportation network or infrastructure.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00825df388190a58742fa9b1aa33d completed March 22, 2026, 3:17 p.m.
NER Named-entity recognition batch_69c022d4ca788190b20168b20cb1d030 completed March 22, 2026, 5:11 p.m.
NED1 Entity disambiguation (via context triple) batch_69c04d90c04881908740fb1089c5248a completed March 22, 2026, 8:14 p.m.
PD Predicate disambiguation batch_69c01b2274b48190b2ef57ed728f785c completed March 22, 2026, 4:38 p.m.
Created at: March 22, 2026, 3:42 p.m.