Triple
T5639860
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hurva Synagogue (unbuilt project) |
E124238
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | work by Louis Kahn |
C7141
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: work by Louis Kahn Context triple: [Hurva Synagogue (unbuilt project), instanceOf, work by Louis Kahn]
-
A.
architectural work
chosen
An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
-
B.
modernist architecture work
A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
-
C.
Streamline Moderne building
A Streamline Moderne building is a late Art Deco architectural form characterized by smooth, curving surfaces, horizontal lines, nautical or aerodynamic motifs, and minimal ornamentation that evoke speed and modernity.
-
D.
Persian architect
A Persian architect is a designer who plans and creates buildings and spaces that reflect the aesthetic, cultural, and structural traditions of Persian architecture.
-
E.
modernist architectural work
A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c00824643c81909ffdb888a2d35189 |
completed | March 22, 2026, 3:17 p.m. |
Created at: March 22, 2026, 3:41 p.m.